New Features for EDA and EMC/EMI Workflows in CST STUDIO SUITE

2 April 2014
New Features for EDA and EMC/EMI Workflows in CST STUDIO SUITE 2014

TIME: 8:00 UTC (10:00 Central Europe, 13:30 India, 16:00 China)(Duration: 1 hour)

DESCRIPTION: To ensure that devices work correctly even in shared environments, engineers must consider signal integrity (SI), power integrity (PI), electromagnetic compatibility (EMC) and interference (EMI). With the release of CST STUDIO SUITE® 2014, our EM simulation tools have been developed further to help engineers analyze and improve their electronic designs.

Both comments and pings are currently closed.

Comments are closed.

Design by 2b Consult